Prev Page | Home | Start of Tour | Download Demo | Next Page

Costar Guided Tour: The Costs Tab

This image depicts the main Costar Window with the Costs notebook tab selected.

You can set the cost per Person-Month for each of the COCOMO phases in either of two ways:

1) Simply fill in a cost in the appropriate field.

2) Use the Labor Distribution Worksheet and the Rates tab to calculate the figure based on the labor classes assigned to each phase.

Page 8 of 12

 Copyright © 1986-2005 Softstar Systems All rights reserved.